- Reception under ship's hoist of heavy and abnormal loads onto modulated trailers,
- Storage on beams and retrieval of heavy and abnormal loads,
- Rental of storage beams and associated equipment,
- Transport of heavy and abnormal loads (heavy & oversized packages),
- Installation and removal of heavy load packages (Transformers, generators, turbines).
We carry out the above activities at the ports of entry and across the national territory for all our petroleum, energy and industrial sectors customers.
During the engineering study and the preparation phase Sarl TRANSBAOUCHI undertakes the following tasks:
- Studies the itineraries meticulously by surveying the route to identify all obstacles.
- Lodges a request with highway authorities (DTP) to negotiate safe passage of the convoy on the public highway, agglomerations and bridges on the itinerary.
- Proposes the necessary obstacle deviations in order to facilitate the safe passage of the convoy.
- Lodges request for security escorts to ensure safety throughout the journey.
Our achievements
Project: SNC LAVALIN–CO2 Absorber Unit
Itinerary: Port of Gabes (Tunisia) to Rhoud Nouss (Algeria)
distance of 900 Km.
Size: 30.8 x 5.20 x 5.44 Weight: 415 Tons
Project: Sonatrach Hassi Messaoud
Itinerary: Arzew - Hassi Messaoud
Travelled distance: 1200 Km
Size: 28 x 4.2 x 4.80 weight: 187T
Project: Power plant of M’sila
Itinerary: Skikda – M’sila
Travelled distance: 600 Km
Unit size: 13.00 x 5.20 x 5.50 Weight: 310T
Project: Power plant of Berrouaguia
Itinerary: Arzew – Berrouaguia
Travelled distance: 1100 Km
Unit size: 13.00 x 5.20 x 5.50 Weight: 310T